

| INSTALLATION | |
| DIAGRAM1 A) MEASURE THE CEILING AND WALL AREA IN LENGTH AND HEIGHT. B) OUTLINE THE HORIZONTAL LINE OF THE AREA. | DIAGRAM4 A) FOR THE SECOND PVC BOARD AND THE NEXT ONES, USING AIR-GUN TO FASTEN BY NAIL. B) IN CASE OF USING LIGHTING SYSTEM, IT NEEDED TO HAVE THE TOOLS LIKE KNIFE AND SAW FOR MAKING HOLE. | 
| DIAGRAM2 A) IN CASE OF THE CEILING IS NOT FLAT, IT IS NEEDED TO FIX SUSPENSION BAR FIRST. | DIAGRAM5 A) USING WALL ANGLE AND PROFILE TO TRIM THE EDGE CLOSE TO THE WALL FOR BETTER DECORATION EFFECT. | 
| DIAGRAM3 A) FIXING THE PVC BOARD WITH THE SUSPENSION BAR AS SHOWN. B) USING STEEL NAIL TO FASTEN THE FIRST PVC BOARD. | DIAGRAM6 A) FOR WALL BOARDING, DO IT AS THE ABOVE-MENTIONED PROCESS. | 



 
                
        